Before the water solenoid valve is installed on the pipeline, it is necessary to check the pressure and caliber of the valve again and clean up the dirt on the valve parts during transportation. When the valve is installed on the pipeline, it should be installed correctly according to the connection mode of the valve. The installation position of the valve should consider whether the operator's operation is convenient after installation, and whether it is convenient for the valve to be repaired in the future.